Design Review of Earthing and Earthing Study for Formosa 2 Onshore Substation, Taiwan

Design Review of Earthing and Earthing Study for Formosa 2 Onshore Substation, Taiwan

Formosa 2 Wind Power Co., Ltd was in the process of building the 376 MW Formosa 2 offshore wind farm including an onshore substation. Within the context of an extension of the substation to also include a harmonic filter compound, Formosa 2 has contracted Fichtner Pacific Engineers Inc. for the review of the design and the built parts of the earthing system as well as to perform a software modelling and prepare an independent earthing study for the onshore substation.

Our services

  • Fichtner has:
  • reviewed of the contractor’s substation earthing design and execution;
  • performed a second opinion earthing software calculation and study (in ETAP);
  • identified potential gaps in the design and/or execution and
  • suggested corresponding mitigation measures.

Technical data

  • Substation voltage levels: 22.8/ 69 / 161 kV
  • Offshore Wind Farm Capacity: 376 MW

Client

Formosa 2 Wind Power Co., Ltd.