After more than 20 years of operation the Muzha refuse incineration plant required a retrofit during the continuing operation. Due to increased heating value of waste and more stringent emission standards, the retrofit must address these new requirements regarding waste treatment and flue gas cleaning. Fichtner was contracted by the EPC contractor to support him with engineering and project management services from proposal preparation throughout commissioning.
Our services
- Bid engineering / support during proposal preparation
- Project management assistance
- Basic and detailed design
- Specification and clarification during procurement
- Technical support during manufacturing and construction
- Preparation and supervision of trial run & performance test
Technical data
- 4 incineration lines with a capacity of 375 t/d
- Net power generation: 13.5 MWel