Taoyuan Biomass Anaerobic Digestion Plant, Incineration Plant and Landfill (BOT), Taiwan
The project includes a 660T/D thermal treatment system (waste incineration), a 135T/D anaerobic digestion system installed with a 37MVA steam generator, generating 11kV electricity from steam, and then stepping up voltage to 161kV by transformer. Generated electricity goes through Air-Insulated Switchgear (AIS), via underground transmission line and ties into Bao-Sheng substation Gas Insulated Switchgear of Taipower.
Our services
- Basic and detailed design review, site construction and commissioning supervision.
- AIS installation supervision, Quality Assurance of AIS CT turn ratio tests, AIS CT insulation test, AIS CT dielectric withstand voltage test.
- 161kV GIS FAT.
- 161kV XLPE cables FAT, Quality Assurance of partial discharge test, AC withstand voltage test, insulation resistance test, DC withstand voltage test.
- Supervision of underground transmission cable joints connection.
- Quality Assurance of 161kV XLPE cables AC withstand voltage test before power energized.
Technical data
- A 660T/D thermal treatment system (waste incineration)
- A 135T/D anaerobic digestion system
- Substation voltage levels:161 kV