After more than 20 years of continuous operation, the Muzha Refuse Incineration Plant required a comprehensive upgrade to meet rising waste heating values and increasingly stringent emission standards. The retrofit aimed to enhance waste treatment capacity, modernize the entire flue gas cleaning system, and restore the electrical infrastructure to accommodate higher power output. Special features of the project included executing all upgrade measures during ongoing plant operation, replacing the electrostatic precipitator with membrane bag filters, renewing key systems such as the ID fan and SNCR, and completing structural improvements including a full repainting of the 150 meter stack. Additional renovations to various buildings rounded off the modernization effort. To ensure the project’s successful execution from concept to commissioning, Fichtner provided engineering and project management support throughout all phases.
Project Factsheet
Incineration lines
Total thermal treatment capacity after retrofit
Net power generation
Key Facts
Client
Chung-Hsin Electric and Machinery Manufacturing Corp.
Taipei
Taiwan