Formosa 3 Offshore Substation Planning and Tender Support

Taiwan

Project Factsheet

The Formosa 3 offshore wind project aims to advance Taiwan’s energy transition by developing a 600 MW offshore wind farm supported by a dedicated offshore substation. Set in the challenging conditions of the Taiwan Strait, the project requires careful coordination of technical planning, regulatory alignment, and procurement preparation to secure grid allocation and ensure long-term system performance. Key tasks include defining a robust transmission concept, harmonizing requirements across offshore and onshore infrastructure, and adapting the design to evolving market and policy frameworks. Particular focus has been placed on optimizing electrical configurations, preparing competitive bid documentation, and managing complex interfaces between project packages. In this dynamic environment, Fichtner contributed its expertise by steering project management activities, guiding conceptual planning, and supporting the complete tendering process for the offshore substation.

Offshore wind farm and substation capacity
Substation voltage levels
Key Facts

Technical Consultancy for the Formosa 3 OSS Package

  • OSS package management
  • Review and finalization of Employer’s Requirements
  • EPC tender management and bid evaluation
  • Project bid preparation support
  • EPC contract negotiations
  • Detailed design review
  • Electrical system optioneering studies
  • Subsea and land substation package support
  • Offshore wind farm capacity: 600 MW
  • Substation voltage levels: 69 / 220 kV
  • Combined site area: 105 km²
  • Water depth: 18-45 m
  • Rated power at POI: 840 MW
  • WTG capacity: 14 MW
  • Number of turbines: 60

Client

Haiding One International Investment Co. Ltd.

Taipei
Taiwan