Feasibility Study and Tender Support for a Transmission-Scale BESS Project

Taiwan

Project Factsheet

The project aims to advance grid stability in Taiwan by developing a transmission-scale battery energy storage system capable of participating in Taipower’s ancillary service market. To achieve this, the client is planning the installation of a large-scale BESS facility accompanied by a new high-voltage substation, dedicated transmission lines, and all related grid-connection works. The project’s tasks include ensuring suitable site conditions, navigating permitting requirements, and establishing a robust technical basis that supports efficient procurement and future commercial operation. Key solutions center on integrating the storage system into the national grid to enhance flexibility and reliability. A particular feature of the project is its comprehensive development approach, which spans early feasibility considerations through to tendering. In this context, Fichtner provided expert analysis, concept design input, and tender support.

Preliminary BESS capacity
Substation voltage levels
Key Facts

Developing a Transmission Scale BESS for Taiwan’s Grid

  • Site assessment
  • Permitting and grid constraint review
  • Geotechnical and hydrological studies
  • Foundation and layout concept design
  • Technical specification preparation
  • Tender evaluation
  • Tender negotiation
  • Development‑phase feasibility study
  • BESS capacity: around 50 MW / 150 MWh
  • Substation voltage levels: 22.8 / 161 kV