The project aims to advance grid stability in Taiwan by developing a transmission-scale battery energy storage system capable of participating in Taipower’s ancillary service market. To achieve this, the client is planning the installation of a large-scale BESS facility accompanied by a new high-voltage substation, dedicated transmission lines, and all related grid-connection works. The project’s tasks include ensuring suitable site conditions, navigating permitting requirements, and establishing a robust technical basis that supports efficient procurement and future commercial operation. Key solutions center on integrating the storage system into the national grid to enhance flexibility and reliability. A particular feature of the project is its comprehensive development approach, which spans early feasibility considerations through to tendering. In this context, Fichtner provided expert analysis, concept design input, and tender support.
Project Factsheet
Preliminary BESS capacity
Substation voltage levels
Key Facts